ITAC Assessment: LE0417
ITAC logo
ITAC Assessment: LE0417
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Commercial Refrigerators
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 69,000
ft2
Annual Production 2,400
pieces
Production Hrs. Annual 2,808
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,893 810,476
kWh
Electricity Demand $14,410 2,664
kW-mo/yr
Electricity Fees $6,338 -
Natural Gas $21,083 1,736
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,939

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,317 $46 $1,014
12,513
kWh
$303
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,844 $1,000 $2,193
27,075
kWh
$651
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $715 $500 $553
6,823
kWh
$162
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $1,687 $1,868 - - $1,687
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,602 $25,000 $5,271
65,074
kWh
$1,331
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,120 $22,015 $4,281
52,853
kWh
$839
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $13,659 $62,300 $10,867
134,160
kWh
$2,792
-
kW-mo/yr
-
TOTAL RECOMMENDED $31,943 $112,729 $24,178
298,498
kWh
$6,078
-
kW-mo/yr
$1,687
-
MMBtu
TOTAL IMPLEMENTED $28,939 $110,815 $23,165
285,985
kWh
$5,775
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs