Assessment Year | 2016 |
---|---|
Principal Product | Synvisc and Hectorol |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | greater than $500 M |
# of Employees | 175 |
Plant Area |
80,000
ft2
|
Annual Production | 42,000,000
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $596,915 | 7,362,773 |
kWh
|
$0.081 |
Electricity Demand | $54,581 | 15,573 |
kW-mo/yr
|
$3.50 |
Electricity Fees | $275,761 | - |
|
- |
Natural Gas | $329,919 | 56,810 |
MMBtu
|
$5.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,068 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $49,817 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,057 | - |
$2,794
34,496
kWh
|
$263
-
kW-mo/yr
|
- | - | |
02 | 2.2442: Preheat combustion air with waste heat | $34,860 | $36,000 | - | - |
$34,860
-
MMBtu
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,251 | $1,460 |
$1,167
14,412
kWh
|
$84
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,088 | $14,625 |
$6,157
76,010
kWh
|
$522
-
kW-mo/yr
|
- | $410 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,482 | $10,500 |
$2,399
29,615
kWh
|
$284
-
kW-mo/yr
|
- | $1,800 | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $330 | $1,140 |
$218
2,686
kWh
|
$112
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $51,068 | $63,725 |
$12,735
157,219
kWh
|
$1,264
-
kW-mo/yr
|
$34,860
-
MMBtu
|
$2,210 | ||
TOTAL IMPLEMENTED | $49,817 | $62,265 |
$11,567
142,807
kWh
|
$1,180
-
kW-mo/yr
|
$34,860
-
MMBtu
|
$2,210 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs