ITAC Assessment: LE0414
ITAC logo
ITAC Assessment: LE0414
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Synvisc and Hectorol
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range greater than $500
M
# of Employees 175
Plant Area 80,000
ft2
Annual Production 42,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $596,915 7,362,773
kWh
Electricity Demand $54,581 15,573
kW-mo/yr
Electricity Fees $275,761 -
Natural Gas $329,919 56,810
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,068 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,817

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,057 - $2,794
34,496
kWh
$263
-
kW-mo/yr
- -
02 2.2442: Preheat combustion air with waste heat $34,860 $36,000 - - $34,860
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $1,251 $1,460 $1,167
14,412
kWh
$84
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,088 $14,625 $6,157
76,010
kWh
$522
-
kW-mo/yr
- $410
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,482 $10,500 $2,399
29,615
kWh
$284
-
kW-mo/yr
- $1,800
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $330 $1,140 $218
2,686
kWh
$112
-
kW-mo/yr
- -
TOTAL RECOMMENDED $51,068 $63,725 $12,735
157,219
kWh
$1,264
-
kW-mo/yr
$34,860
-
MMBtu
$2,210
TOTAL IMPLEMENTED $49,817 $62,265 $11,567
142,807
kWh
$1,180
-
kW-mo/yr
$34,860
-
MMBtu
$2,210
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs