ITAC Assessment: LE0413
ITAC logo
ITAC Assessment: LE0413
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product wire rope
NAICS 332618: Other Fabricated Wire Product Manufacturing
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $100
M
to 500
M
# of Employees 140
Plant Area 186,600
ft2
Annual Production 30,751
ton
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $363,708 6,327,900
kWh
Electricity Demand $29,210 13,733
kW-mo/yr
Electricity Fees $16,824 -
Natural Gas $33,763 4,923
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,559 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,940

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $5,124 $500 - - $5,124
-
MMBtu
02 2.7135: Install occupancy sensors $1,494 $725 $1,494
26,208
kWh
- -
03 2.2437: Recover waste heat from equipment $3,060 $1,800 - - $3,060
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $973 $1,000 $865
15,173
kWh
$109
-
kW-mo/yr
-
05 2.7261: Install timers and/or thermostats $482 $590 $66
1,158
kWh
- $416
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,404 $15,000 $8,085
141,842
kWh
$320
-
kW-mo/yr
-
07 2.2614: Use cooling tower or economizer to replace chiller cooling $13,462 $25,000 $12,025
210,960
kWh
$1,438
-
kW-mo/yr
-
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,559 $14,000 $8,670
152,100
kWh
$848
-
kW-mo/yr
$(-3,958.2)
-
MMBtu
TOTAL RECOMMENDED $38,559 $58,615 $31,204
547,441
kWh
$2,714
-
kW-mo/yr
$4,641
-
MMBtu
TOTAL IMPLEMENTED $29,940 $42,815 $22,534
395,341
kWh
$1,866
-
kW-mo/yr
$5,540
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs