Assessment Year | 2016 |
---|---|
Principal Product | Remanufactured Engines |
NAICS | 333618: Other Engine Equipment Manufacturing |
SIC | 3519: Internal Combustion Engines, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 175 |
Plant Area |
70,000
ft2
|
Annual Production | 5,000
pieces
|
Production Hrs. Annual | 6,552
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $206,567 | 2,796,600 |
kWh
|
$0.074 |
Electricity Demand | $36,389 | 8,680 |
kW-mo/yr
|
$4.19 |
Electricity Fees | $22,005 | - |
|
- |
Natural Gas | $76,475 | 9,275 |
MMBtu
|
$8.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,522 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,486 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2442: Preheat combustion air with waste heat | $13,984 | $20,000 | - | - |
$13,984
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,397 | $8,050 |
$2,770
37,434
kWh
|
$2,627
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,688 | $19,250 |
$5,452
73,678
kWh
|
$1,236
-
kW-mo/yr
|
- | |
04 | 2.2136: Install / repair insulation on steam lines | $462 | $1,382 | - | - |
$462
-
MMBtu
|
|
05 | 2.4226: Use / purchase optimum sized compressor | $4,944 | $18,280 |
$4,533
61,260
kWh
|
$411
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,108 | $4,125 |
$957
12,929
kWh
|
$151
-
kW-mo/yr
|
- | |
07 | 2.7243: Improve air circulation with destratification fans / other methods | $7,939 | $35,720 |
$6,690
90,410
kWh
|
$1,249
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $40,522 | $106,807 |
$20,403
275,711
kWh
|
$5,673
-
kW-mo/yr
|
$14,446
-
MMBtu
|
||
TOTAL IMPLEMENTED | $20,486 | $64,402 |
$14,913
201,522
kWh
|
$5,112
-
kW-mo/yr
|
$462
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs