ITAC Assessment: LE0407
ITAC logo
ITAC Assessment: LE0407
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Sheet Metal
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 87
Plant Area 75,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,933 1,491,600
kWh
Electricity Demand $15,595 4,393
kW-mo/yr
Electricity Fees $16,583 -
Natural Gas $118,537 9,896
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,902 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,792

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $143 - $143
1,934
kWh
- - - -
02 2.8114: Change rate schedules or other changes in utility service $19,792 $25 - - - $19,792 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,305 $1,800 $6,687
90,368
kWh
$618
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $707 $200 $707
9,558
kWh
- - - -
05 2.7135: Install occupancy sensors $7,907 $12,234 $6,988
94,427
kWh
$476
-
kW-mo/yr
- - $444
06 2.1221: Replace obsolete burners with more efficient ones $3,031 $9,467 - - $3,031
-
MMBtu
- -
07 2.4226: Use / purchase optimum sized compressor $8,016 $28,500 $7,338
99,167
kWh
$678
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $46,902 $52,226 $21,864
295,454
kWh
$1,771
-
kW-mo/yr
$3,031
-
MMBtu
$19,792 $444
TOTAL IMPLEMENTED $19,792 $25 - - - $19,792 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs