Assessment Year | 2015 |
---|---|
Principal Product | Waste Water treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 32 |
Plant Area |
4,000,000
ft2
|
Annual Production | 26,000
Tgal
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $566,833 | 10,407,445 |
kWh
|
$0.054 |
Electricity Demand | $23,444 | 16,058 |
kW-mo/yr
|
$1.46 |
Electricity Fees | $39,323 | - |
|
- |
Natural Gas | $154,761 | 15,136 |
MMBtu
|
$10.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,713 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,544 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,544 | $1,000 |
$1,488
27,562
kWh
|
$55
-
kW-mo/yr
|
- | |
02 | 2.2437: Recover waste heat from equipment | $9,299 | $10,000 | - | - |
$9,299
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,349 | $6,500 |
$5,279
97,756
kWh
|
$70
-
kW-mo/yr
|
- | |
04 | 2.4226: Use / purchase optimum sized compressor | $5,477 | $20,000 |
$5,157
95,504
kWh
|
$320
-
kW-mo/yr
|
- | |
05 | 2.1336: Install equipment to utilize waste fuel | $4,044 | $20,000 |
$2,407
44,580
kWh
|
- |
$1,637
-
MMBtu
|
|
TOTAL RECOMMENDED | $25,713 | $57,500 |
$14,332
265,402
kWh
|
$445
-
kW-mo/yr
|
$10,936
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,544 | $1,000 |
$1,488
27,562
kWh
|
$55
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs