ITAC Assessment: LE0405
ITAC logo
ITAC Assessment: LE0405
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Waste Water treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 32
Plant Area 4,000,000
ft2
Annual Production 26,000
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $566,833 10,407,445
kWh
Electricity Demand $23,444 16,058
kW-mo/yr
Electricity Fees $39,323 -
Natural Gas $154,761 15,136
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,713 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,544

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,544 $1,000 $1,488
27,562
kWh
$55
-
kW-mo/yr
-
02 2.2437: Recover waste heat from equipment $9,299 $10,000 - - $9,299
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,349 $6,500 $5,279
97,756
kWh
$70
-
kW-mo/yr
-
04 2.4226: Use / purchase optimum sized compressor $5,477 $20,000 $5,157
95,504
kWh
$320
-
kW-mo/yr
-
05 2.1336: Install equipment to utilize waste fuel $4,044 $20,000 $2,407
44,580
kWh
- $1,637
-
MMBtu
TOTAL RECOMMENDED $25,713 $57,500 $14,332
265,402
kWh
$445
-
kW-mo/yr
$10,936
-
MMBtu
TOTAL IMPLEMENTED $1,544 $1,000 $1,488
27,562
kWh
$55
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs