ITAC Assessment: LE0399
ITAC logo
ITAC Assessment: LE0399
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Sterilization assurance products
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3482: Small Arms Ammunition
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 204,800
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $481,236 6,106,359
kWh
Electricity Demand $78,936 12,023
kW-mo/yr
Electricity Fees $92,595 -
Natural Gas $110,694 10,433
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $114,539 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,486

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $2,461 $240 $2,461
31,150
kWh
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,851 $250 $1,589
20,110
kWh
$263
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,048 $1,000 $3,014
38,153
kWh
$34
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,126 $7,367 $15,121
191,405
kWh
$1,005
-
kW-mo/yr
- -
05 2.2442: Preheat combustion air with waste heat $3,395 $3,600 - - $3,395
-
MMBtu
-
06 2.1224: Replace boiler $16,753 $20,000 - - $16,753
-
MMBtu
-
07 2.7124: Make a practice of turning off lights when not needed $40,472 $57,142 $35,715
452,088
kWh
$4,757
-
kW-mo/yr
- -
08 2.4226: Use / purchase optimum sized compressor $20,955 $64,500 $19,648
248,710
kWh
$1,307
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $5,727 $17,780 $4,950
62,663
kWh
$105
-
kW-mo/yr
- $672
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,750 $20,000 $3,310
41,895
kWh
$440
-
kW-mo/yr
- -
TOTAL RECOMMENDED $114,539 $191,879 $85,808
1,086,174
kWh
$7,911
-
kW-mo/yr
$20,148
-
MMBtu
$672
TOTAL IMPLEMENTED $23,486 $8,857 $22,185
280,818
kWh
$1,302
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs