Assessment Year | 2015 |
---|---|
Principal Product | Sterilization assurance products |
NAICS | 339113: Surgical Appliance and Supplies Manufacturing |
SIC | 3482: Small Arms Ammunition |
Sales Range | $5 M to 10M |
# of Employees | 25 |
Plant Area |
204,800
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $481,236 | 6,106,359 |
kWh
|
$0.079 |
Electricity Demand | $78,936 | 12,023 |
kW-mo/yr
|
$6.57 |
Electricity Fees | $92,595 | - |
|
- |
Natural Gas | $110,694 | 10,433 |
MMBtu
|
$10.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $114,539 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,486 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $2,461 | $240 |
$2,461
31,150
kWh
|
- | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,851 | $250 |
$1,589
20,110
kWh
|
$263
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,048 | $1,000 |
$3,014
38,153
kWh
|
$34
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,126 | $7,367 |
$15,121
191,405
kWh
|
$1,005
-
kW-mo/yr
|
- | - | |
05 | 2.2442: Preheat combustion air with waste heat | $3,395 | $3,600 | - | - |
$3,395
-
MMBtu
|
- | |
06 | 2.1224: Replace boiler | $16,753 | $20,000 | - | - |
$16,753
-
MMBtu
|
- | |
07 | 2.7124: Make a practice of turning off lights when not needed | $40,472 | $57,142 |
$35,715
452,088
kWh
|
$4,757
-
kW-mo/yr
|
- | - | |
08 | 2.4226: Use / purchase optimum sized compressor | $20,955 | $64,500 |
$19,648
248,710
kWh
|
$1,307
-
kW-mo/yr
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,727 | $17,780 |
$4,950
62,663
kWh
|
$105
-
kW-mo/yr
|
- | $672 | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,750 | $20,000 |
$3,310
41,895
kWh
|
$440
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $114,539 | $191,879 |
$85,808
1,086,174
kWh
|
$7,911
-
kW-mo/yr
|
$20,148
-
MMBtu
|
$672 | ||
TOTAL IMPLEMENTED | $23,486 | $8,857 |
$22,185
280,818
kWh
|
$1,302
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs