ITAC Assessment: LE0398
ITAC logo
ITAC Assessment: LE0398
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product High purity gases
NAICS 325120: Industrial Gas Manufacturing
SIC 2813: Industrial Gases
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area 20,000
ft2
Annual Production 56,400
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $225,906 2,622,780
kWh
Electricity Demand $32,155 4,877
kW-mo/yr
Electricity Fees $39,615 -
Natural Gas $42,874 3,725
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,226 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $903

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.2622: Replace existing chiller with high efficiency model $21,570 $12,000 $19,672
228,736
kWh
$1,898
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $903 $525 $692
8,044
kWh
$211
-
kW-mo/yr
- -
03 2.7261: Install timers and/or thermostats $2,761 $2,125 $241
2,797
kWh
- $2,521
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,857 $14,800 $11,972
139,213
kWh
$1,885
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $369 $884 $323
3,756
kWh
$46
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $205 $600 $205
2,387
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,132 $3,725 $987
11,482
kWh
$145
-
kW-mo/yr
- -
08 2.9114: Use solar heat to make electricty $29,538 $129,220 $7,544
87,725
kWh
- - $21,994
09 2.7142: Utilize higher efficiency lamps and/or ballasts $6,157 $27,450 $5,366
62,400
kWh
$791
-
kW-mo/yr
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,733 $8,550 $1,465
17,035
kWh
$268
-
kW-mo/yr
- -
TOTAL RECOMMENDED $78,226 $199,879 $48,468
563,575
kWh
$5,243
-
kW-mo/yr
$2,521
-
MMBtu
$21,994
TOTAL IMPLEMENTED $903 $525 $692
8,044
kWh
$211
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs