Assessment Year | 2020 |
---|---|
Principal Product | Medical textiles |
NAICS | 339113: Surgical Appliance and Supplies Manufacturing |
SIC | 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
56,000
ft2
|
Annual Production | 3,500,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $133,032 | 2,090,220 |
kWh
|
$0.064 | |
Electricity Demand | $24,054 | 5,664 |
kW-mo/yr
|
$4.25 | |
Natural Gas | $56,287 | 7,706 |
MMBtu
|
$7.30 | |
Waste Disposal Costs | |||||
Water Usage | $21,500 | 2,400 |
Tgal
|
$8.96 | |
TOTAL YEARLY COSTS | $234,873 | ||||
RECOMMENDED SAVINGS* | $44,267 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $15,429 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,107 | $210 |
$976
15,352
kWh
|
$131
-
kW-mo/yr
|
- | |
02 | 2.8114: Change rate schedules or other changes in utility service | $18,080 | $500 |
$18,080
-
kWh
|
- | - | |
03 | 2.2136: Install / repair insulation on steam lines | $2,430 | $997 | - | - |
$2,430
-
MMBtu
|
|
04 | 2.7241: Install outside air damper / economizer on hvac unit | $9,651 | $8,000 |
$9,651
151,751
kWh
|
- | - | |
05 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $955 | $2,350 |
$1,018
16,000
kWh
|
$136
-
kW-mo/yr
|
$(-199.0)
-
MMBtu
|
|
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,730 | $1,200 | - | - |
$2,730
-
MMBtu
|
|
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,314 | $20,000 |
$8,966
140,970
kWh
|
$348
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $44,267 | $33,257 |
$38,691
324,073
kWh
|
$615
-
kW-mo/yr
|
$4,961
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,429 | $24,547 |
$9,984
156,970
kWh
|
$484
-
kW-mo/yr
|
$4,961
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs