ITAC Assessment: LE0390
ITAC logo
ITAC Assessment: LE0390
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Steel Wire and Related Products
NAICS 331222: Steel Wire Drawing
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $10
M
to 50
M
# of Employees 39
Plant Area 73,880
ft2
Annual Production 25,084,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,922 3,692,000
kWh
Electricity Demand $50,711 12,097
kW-mo/yr
Electricity Fees $71,389 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $107,339 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,479

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,174 $28 $2,880
40,003
kWh
$293
-
kW-mo/yr
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $34,972 $5,400 $50,392
699,882
kWh
- $(-15,420.0)
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,489 $1,000 $4,982
69,192
kWh
$507
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $398 $75 $398
5,535
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $558 $120 $507
7,038
kWh
$52
-
kW-mo/yr
- -
06 2.2622: Replace existing chiller with high efficiency model $47,479 $25,500 $43,095
598,541
kWh
$4,384
-
kW-mo/yr
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,361 $2,457 $3,563
49,488
kWh
$797
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,333 $5,028 $4,296
59,673
kWh
$36
-
kW-mo/yr
- -
09 2.7135: Install occupancy sensors $3,974 $7,332 $3,654
50,755
kWh
$141
-
kW-mo/yr
- $179
10 2.4323: Use optimum size and capacity equipment $2,602 $5,200 $2,602
36,145
kWh
- - -
TOTAL RECOMMENDED $107,339 $52,140 $116,370
1,616,252
kWh
$6,211
-
kW-mo/yr
$(-15,420.0)
-
MMBtu
$179
TOTAL IMPLEMENTED $47,479 $25,500 $43,095
598,541
kWh
$4,384
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs