| Assessment Year | 2015 |
|---|---|
| Principal Product | Aluminum trim coil |
| NAICS | 332322: Sheet Metal Work Manufacturing |
| SIC | 3444: Sheet Metal Work |
| Sales Range | $5 M to 10M |
| # of Employees | 105 |
| Plant Area |
300,000
ft2
|
| Annual Production | 30,000,000
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $471,880 | 6,262,658 |
kWh
|
$0.075 |
| Electricity Demand | $77,476 | 15,223 |
kW-mo/yr
|
$5.09 |
| Electricity Fees | $188,172 | - |
|
- |
| Natural Gas | $655,738 | 80,123 |
MMBtu
|
$8.18 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $335,530 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7135: Install occupancy sensors | $1,375 | - |
$1,375
18,331
kWh
|
- | - | - | |
| 02 | 2.6122: Adjust vents to minimize energy use | $163,566 | $7,716 |
$(-1,481.9)
(-19,759)
kWh
|
- |
$165,048
-
MMBtu
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,549 | $1,000 |
$3,132
41,757
kWh
|
$417
-
kW-mo/yr
|
- | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $67,292 | $22,580 |
$7,500
100,000
kWh
|
$59,792
-
kW-mo/yr
|
- | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,707 | $2,050 |
$5,153
68,708
kWh
|
$554
-
kW-mo/yr
|
- | - | |
| 06 | 2.4226: Use / purchase optimum sized compressor | $83,193 | $86,300 |
$72,451
966,015
kWh
|
$9,457
-
kW-mo/yr
|
$1,284
-
MMBtu
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,929 | $14,175 |
$3,784
50,450
kWh
|
$769
-
kW-mo/yr
|
- | $377 | |
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,919 | $23,100 |
$5,237
69,826
kWh
|
$682
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $335,530 | $156,921 |
$97,150
1,295,328
kWh
|
$71,671
-
kW-mo/yr
|
$166,332
-
MMBtu
|
$377 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs