ITAC Assessment: LE0387
ITAC logo
ITAC Assessment: LE0387
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Aluminum trim coil
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 105
Plant Area 300,000
ft2
Annual Production 30,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $471,880 6,262,658
kWh
Electricity Demand $77,476 15,223
kW-mo/yr
Electricity Fees $188,172 -
Natural Gas $655,738 80,123
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $335,530 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $1,375 - $1,375
18,331
kWh
- - -
02 2.6122: Adjust vents to minimize energy use $163,566 $7,716 $(-1,481.9)
(-19,759)
kWh
- $165,048
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,549 $1,000 $3,132
41,757
kWh
$417
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $67,292 $22,580 $7,500
100,000
kWh
$59,792
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,707 $2,050 $5,153
68,708
kWh
$554
-
kW-mo/yr
- -
06 2.4226: Use / purchase optimum sized compressor $83,193 $86,300 $72,451
966,015
kWh
$9,457
-
kW-mo/yr
$1,284
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,929 $14,175 $3,784
50,450
kWh
$769
-
kW-mo/yr
- $377
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,919 $23,100 $5,237
69,826
kWh
$682
-
kW-mo/yr
- -
TOTAL RECOMMENDED $335,530 $156,921 $97,150
1,295,328
kWh
$71,671
-
kW-mo/yr
$166,332
-
MMBtu
$377
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs