ITAC Assessment: LE0376
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Rolls & English Miffins
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 100,000
ft2
Annual Production 30,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $406,162 6,346,281
kWh
Electricity Demand $39,201 11,022
kW-mo/yr
Electricity Fees $22,441 -
Natural Gas $301,265 48,907
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,109 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,016

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2442: Preheat combustion air with waste heat $15,425 $1,330 - - $15,425
-
MMBtu
02 2.4239: Eliminate or reduce compressed air usage $10,341 $2,500 $9,599
149,978
kWh
$742
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $8,711 $3,192 $3,691
57,676
kWh
$5,020
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $1,614 $673 $1,465
22,883
kWh
$149
-
kW-mo/yr
-
05 2.2113: Repair or replace steam traps $2,157 $1,170 - - $2,157
-
MMBtu
06 2.4323: Use optimum size and capacity equipment $22,081 $10,500 $22,081
345,021
kWh
- -
07 2.2437: Recover waste heat from equipment $2,223 $1,830 - - $2,223
-
MMBtu
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,345 $17,700 $12,398
193,723
kWh
$947
-
kW-mo/yr
-
09 2.7135: Install occupancy sensors $3,381 $11,736 $3,381
52,835
kWh
- -
10 2.4226: Use / purchase optimum sized compressor $42,779 $169,000 $39,742
620,975
kWh
$3,037
-
kW-mo/yr
-
11 2.4222: Install adequate dryers on air lines to eliminate blowdown $4,052 $20,066 $3,700
57,808
kWh
$352
-
kW-mo/yr
-
TOTAL RECOMMENDED $126,109 $239,697 $96,057
1,500,900
kWh
$10,247
-
kW-mo/yr
$19,805
-
MMBtu
TOTAL IMPLEMENTED $45,016 $61,172 $41,560
649,387
kWh
$1,299
-
kW-mo/yr
$2,157
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs