ITAC Assessment: LE0365
ITAC logo
ITAC Assessment: LE0365
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Lumber
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 61
Plant Area 1,000,000
ft2
Annual Production 6,234
Tgal
Production Hrs. Annual 4,160
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,266 1,238,942
kWh
Electricity Demand $30,700 4,728
kW-mo/yr
Electricity Fees $22,853 -
Natural Gas $31,255 3,216
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,456 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,549

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $8,272 $11,000 - - $8,272
-
MMBtu
-
02 2.7135: Install occupancy sensors $1,506 $6,750 $1,094
14,988
kWh
$136
-
kW-mo/yr
- $276
03 2.7135: Install occupancy sensors $435 $1,950 $316
4,330
kWh
$39
-
kW-mo/yr
- $80
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,942 $6,385 $1,352
18,520
kWh
$526
-
kW-mo/yr
- $64
05 2.7261: Install timers and/or thermostats $1,398 $115 $1,398
19,144
kWh
- - -
06 2.4323: Use optimum size and capacity equipment $784 $2,653 $784
10,734
kWh
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,158 $5,700 $2,399
32,868
kWh
$759
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $514 $1,000 $410
5,622
kWh
$104
-
kW-mo/yr
- -
09 2.4221: Install compressor air intakes in coolest locations $280 $300 $202
2,771
kWh
$78
-
kW-mo/yr
- -
10 2.7135: Install occupancy sensors $4,529 $1,172 $4,529
62,042
kWh
- - -
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,909 $8,300 $11,333
155,244
kWh
$3,576
-
kW-mo/yr
- -
12 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,729 $8,300 $2,833
38,811
kWh
$896
-
kW-mo/yr
- -
TOTAL RECOMMENDED $41,456 $53,625 $26,650
365,074
kWh
$6,114
-
kW-mo/yr
$8,272
-
MMBtu
$420
TOTAL IMPLEMENTED $15,549 $25,287 $13,181
180,576
kWh
$2,012
-
kW-mo/yr
- $356
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings