ITAC Assessment: LE0364
ITAC logo
ITAC Assessment: LE0364
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Corrugated Shipping Containers
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 264
Plant Area 522,000
ft2
Annual Production 1,700,000
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $586,311 9,150,282
kWh
Electricity Demand $154,529 43,031
kW-mo/yr
Natural Gas $617,387 58,552
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $127,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,532 $10,100 $10,900
170,316
kWh
$1,632
-
kW-mo/yr
02 2.7135: Install occupancy sensors $1,744 $1,360 $1,744
27,256
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $10,131 $393 $9,294
145,226
kWh
$836
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,900 $1,000 $4,552
71,121
kWh
$348
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,249 $228 $110
1,723
kWh
$1,139
-
kW-mo/yr
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,535 $22,875 $16,088
251,372
kWh
$1,447
-
kW-mo/yr
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,989 $28,700 $22,011
343,925
kWh
$1,978
-
kW-mo/yr
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $29,988 $35,500 $27,514
429,907
kWh
$2,474
-
kW-mo/yr
09 2.4231: Reduce the pressure of compressed air to the minimum required $6,865 $14 $6,259
97,791
kWh
$607
-
kW-mo/yr
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,998 $8,300 $5,503
85,982
kWh
$495
-
kW-mo/yr
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,610 $16,600 $11,569
180,768
kWh
$1,041
-
kW-mo/yr
12 2.4111: Utilize energy-efficient belts and other improved mechanisms $429 $294 $393
6,145
kWh
$36
-
kW-mo/yr
TOTAL RECOMMENDED $127,970 $125,364 $115,937
1,811,532
kWh
$12,033
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs