Assessment Year | 2013 |
---|---|
Principal Product | Printing/Mailing |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
160,000
ft2
|
Annual Production | 18
units
|
Production Hrs. Annual | 4,320
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $150,985 | 1,980,200 |
kWh
|
$0.076 |
Electricity Demand | $17,782 | 5,100 |
kW-mo/yr
|
$3.49 |
Electricity Fees | $129,423 | - |
|
- |
Natural Gas | $22,037 | 5,793 |
MMBtu
|
$3.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,909 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,261 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,056 | $8,300 |
$2,757
36,288
kWh
|
$299
-
kW-mo/yr
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $16,814 | $25,500 |
$13,829
181,961
kWh
|
$667
-
kW-mo/yr
|
- | - | $2,318 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,813 | $6,560 |
$1,704
22,426
kWh
|
$42
-
kW-mo/yr
|
- | - | $1,067 | |
04 | 2.7232: Replace existing hvac unit with high efficiency model | $7,603 | $29,670 |
$6,802
89,505
kWh
|
$801
-
kW-mo/yr
|
- | - | - | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,262 | $9,600 |
$2,709
35,650
kWh
|
- | - | $(-447.0) | - | |
06 | 2.2437: Recover waste heat from equipment | $1,806 | $3,200 | - | - |
$1,806
-
MMBtu
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,156 | $5,250 |
$1,912
25,155
kWh
|
$244
-
kW-mo/yr
|
- | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $366 | $80 |
$324
4,160
kWh
|
$42
-
kW-mo/yr
|
- | - | - | |
09 | 2.4323: Use optimum size and capacity equipment | $691 | $700 |
$691
9,100
kWh
|
- | - | - | - | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,342 | $1,000 |
$2,077
27,327
kWh
|
$265
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $39,909 | $89,860 |
$32,805
431,572
kWh
|
$2,360
-
kW-mo/yr
|
$1,806
-
MMBtu
|
$(-447.0) | $3,385 | ||
TOTAL IMPLEMENTED | $8,261 | $13,280 |
$5,849
76,875
kWh
|
$606
-
kW-mo/yr
|
$1,806
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs