ITAC Assessment: HO0128
ITAC logo
ITAC Assessment: HO0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Pretzels
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area 25,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,485 296,893
kWh
Electricity Demand $41,077 1,764
kW-mo/yr
Electricity Fees $3,134 -
Natural Gas $67,371 8,144
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,545 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,165

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $574 $827 $228
3,810
kWh
$346
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $391 $528 $155
2,638
kWh
$236
-
kW-mo/yr
- -
03 2.2414: Use waste heat from hot flue gases to preheat $2,380 $740 - - $2,380
-
MMBtu
-
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $1,000 $1,900 - - $1,000
-
MMBtu
-
05 3.6192: Use a less expensive method of waste removal $1,200 $100 - - - $1,200
-
lb
TOTAL RECOMMENDED $5,545 $4,095 $383
6,448
kWh
$582
-
kW-mo/yr
$3,380
-
MMBtu
$1,200
-
lb
TOTAL IMPLEMENTED $3,165 $3,355 $383
6,448
kWh
$582
-
kW-mo/yr
$1,000
-
MMBtu
$1,200
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs