| Assessment Year | 2011 |
|---|---|
| Principal Product | Flexible Packing |
| NAICS | 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing |
| SIC | 2673: Plastics, Foil, and Coated Paper Bags |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
850,000
ft2
|
| Annual Production | 120
ton
|
| Production Hrs. Annual | 8,500
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $2,248,421 | 39,729,051 |
kWh
|
$0.057 |
| Electricity Demand | $247,326 | 36,371 |
kW-mo/yr
|
$6.80 |
| Natural Gas | $479,219 | 106,178 |
MMBtu
|
$4.51 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $83,840 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $83,840 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,083 | $6,900 |
$5,244
87,397
kWh
|
$839
-
kW-mo/yr
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $58,225 | $57,800 |
$50,194
836,570
kWh
|
$8,031
-
kW-mo/yr
|
|
| 03 | 2.7135: Install occupancy sensors | $12,142 | $3,680 |
$12,142
202,368
kWh
|
- | |
| 04 | 2.7135: Install occupancy sensors | $1,520 | $8,600 |
$1,520
26,674
kWh
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,258 | $1,800 |
$4,258
61,179
kWh
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,612 | - |
$1,612
26,866
kWh
|
- | |
| TOTAL RECOMMENDED | $83,840 | $78,780 |
$74,970
1,241,054
kWh
|
$8,870
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $83,840 | $78,780 |
$74,970
1,241,054
kWh
|
$8,870
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs