ITAC Assessment: LE0359
ITAC logo
ITAC Assessment: LE0359
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Dental Burs
NAICS 339114: Dental Equipment and Supplies Manufacturing
SIC 3843: Dental Equipment and Supplies
Sales Range $10
M
to 50
M
# of Employees 235
Plant Area 43,000
ft2
Annual Production 38,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $331,039 4,597,760
kWh
Electricity Demand $71,487 7,703
kW-mo/yr
Electricity Fees $295,052 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,367 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,304

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7232: Replace existing hvac unit with high efficiency model $9,976 $28,280 $8,476
117,718
kWh
$1,500
-
kW-mo/yr
02 2.7241: Install outside air damper / economizer on hvac unit $8,316 $2,704 $8,316
116,000
kWh
-
03 2.7261: Install timers and/or thermostats $4,813 $1,554 $4,813
66,854
kWh
-
04 2.4224: Upgrade controls on compressors $8,502 $8,500 $7,222
100,312
kWh
$1,280
-
kW-mo/yr
05 2.7263: Lower compressor pressure through a/c system modification $2,575 $22 $2,185
30,344
kWh
$390
-
kW-mo/yr
06 2.4221: Install compressor air intakes in coolest locations $1,953 $500 $1,617
22,464
kWh
$336
-
kW-mo/yr
07 2.2135: Repair and eliminate steam leaks $2,600 $1,000 $2,210
30,703
kWh
$390
-
kW-mo/yr
08 2.7292: Lower ceiling to reduce conditioned space $16,632 $16,660 $16,632
231,001
kWh
-
TOTAL RECOMMENDED $55,367 $59,220 $51,471
715,396
kWh
$3,896
-
kW-mo/yr
TOTAL IMPLEMENTED $18,304 $5,280 $17,524
243,901
kWh
$780
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs