ITAC Assessment: LE0334
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Precast Concrete Parking Garages
NAICS 327390: Other Concrete Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range less than $500
k
# of Employees 40
Plant Area 1,001
ft2
Annual Production 3,792
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $405,516 4,153,001
kWh
Electricity Demand $68,295 15,248
kW-mo/yr
Natural Gas $306,323 36,281
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $212,831 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,131 $225 $9,925
99,183
kWh
$206
-
kW-mo/yr
-
02 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $64,152 $160,000 $52,822
614,218
kWh
$8,058
-
kW-mo/yr
$3,272
-
MMBtu
03 2.2437: Recover waste heat from equipment $44,014 $12,000 $43,355
442,395
kWh
$659
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,529 $10,000 $19,790
201,938
kWh
$1,739
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $20,439 $57,600 $18,786
191,693
kWh
$1,653
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $16,842 $130,000 $14,965
152,705
kWh
$1,877
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $11,030 $40 $10,139
103,461
kWh
$891
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $10,061 $52,345 $9,246
94,348
kWh
$815
-
kW-mo/yr
-
09 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $9,355 $16,675 $9,355
99,133
kWh
- -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,634 $1,000 $3,338
34,065
kWh
$296
-
kW-mo/yr
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $1,644 $8,900 $1,514
15,444
kWh
$130
-
kW-mo/yr
-
TOTAL RECOMMENDED $212,831 $448,785 $193,235
2,048,583
kWh
$16,324
-
kW-mo/yr
$3,272
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs