ITAC Assessment: LE0330
ITAC logo
ITAC Assessment: LE0330
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product RF Cable Assemblies
NAICS 334417: Electronic Connector Manufacturing
SIC 3678: Electronic Connectors
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 52,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,250
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,256 304,080
kWh
Electricity Demand $3,725 850
kW-mo/yr
Natural Gas $8,164 302
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,060

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $67,588 $491,000 $21,180
205,632
kWh
- - $46,408
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,277 $1,600 $17,344
168,390
kWh
$933
-
kW-mo/yr
- -
03 2.7261: Install timers and/or thermostats $10,060 $600 $8,545
82,964
kWh
- $1,515
-
MMBtu
-
TOTAL RECOMMENDED $95,925 $493,200 $47,069
456,986
kWh
$933
-
kW-mo/yr
$1,515
-
MMBtu
$46,408
TOTAL IMPLEMENTED $10,060 $600 $8,545
82,964
kWh
- $1,515
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs