ITAC Assessment: LE0326
ITAC logo
ITAC Assessment: LE0326
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Pressure Vessels
NAICS 336415: Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing
SIC 3764: Guided Missile and Space Vehicle Propulsion Units and Propulsion Unit Parts
Sales Range $10
M
to 50
M
# of Employees 31
Plant Area 54,000
ft2
Annual Production 220
pieces
Production Hrs. Annual 5,460
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,169 1,252,480
kWh
Electricity Demand $62,350 4,297
kW-mo/yr
Natural Gas $15,491 1,368
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,421 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,091

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,373 $21,660 $10,207
88,759
kWh
$2,060
-
kW-mo/yr
- $106
02 2.4226: Use / purchase optimum sized compressor $10,236 $51,475 $8,016
69,707
kWh
$2,220
-
kW-mo/yr
- -
03 2.7111: Reduce illumination to minimum necessary levels $9,313 $108 $7,183
62,462
kWh
$1,988
-
kW-mo/yr
- $142
04 2.7261: Install timers and/or thermostats $6,020 $95 $6,020
52,348
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,890 $10,580 $2,843
24,723
kWh
$784
-
kW-mo/yr
- $263
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,255 $1,000 $3,123
27,158
kWh
$1,132
-
kW-mo/yr
- -
07 2.4221: Install compressor air intakes in coolest locations $2,949 $500 $2,659
23,118
kWh
$290
-
kW-mo/yr
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,956 $25 $1,463
12,722
kWh
$493
-
kW-mo/yr
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,818 $1,000 $483
4,200
kWh
$1,335
-
kW-mo/yr
- -
10 2.2437: Recover waste heat from equipment $1,381 $2,000 - - $1,381
-
MMBtu
-
11 2.1221: Replace obsolete burners with more efficient ones $1,230 $35,000 - - $1,230
-
MMBtu
-
TOTAL RECOMMENDED $55,421 $123,443 $41,997
365,197
kWh
$10,302
-
kW-mo/yr
$2,611
-
MMBtu
$511
TOTAL IMPLEMENTED $51,091 $120,943 $39,338
342,079
kWh
$10,012
-
kW-mo/yr
$1,230
-
MMBtu
$511
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs