Assessment Year | 2011 |
---|---|
Principal Product | Flexible Packaging |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 155 |
Plant Area |
95,000
ft2
|
Annual Production | 450,249
thousand feet
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $292,703 | 5,149,664 |
kWh
|
$0.057 |
Electricity Demand | $133,355 | 8,889 |
kW-mo/yr
|
$15.00 |
Natural Gas | $191,985 | 29,585 |
MMBtu
|
$6.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,132 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,572 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,024 | $2,093 |
$2,206
38,709
kWh
|
$818
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,159 | $1,360 |
$2,304
40,419
kWh
|
$855
-
kW-mo/yr
|
- | - | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $7,200 | $5,076 | - | - |
$7,200
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $356 | $180 |
$356
6,248
kWh
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $9,057 | $19,312 |
$6,391
112,123
kWh
|
$1,365
-
kW-mo/yr
|
- | $1,301 | |
06 | 2.7135: Install occupancy sensors | $6,336 | $12,169 |
$3,583
62,862
kWh
|
$2,580
-
kW-mo/yr
|
- | $173 | |
TOTAL RECOMMENDED | $29,132 | $40,190 |
$14,840
260,361
kWh
|
$5,618
-
kW-mo/yr
|
$7,200
-
MMBtu
|
$1,474 | ||
TOTAL IMPLEMENTED | $12,572 | $20,852 |
$9,051
158,790
kWh
|
$2,220
-
kW-mo/yr
|
- | $1,301 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs