ITAC Assessment: LE0316
ITAC logo
ITAC Assessment: LE0316
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Party Decorations and Novelties
NAICS 322299: All Other Converted Paper Product Manufacturing
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 800,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,680
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,472 3,651,872
kWh
Electricity Demand $159,909 14,146
kW-mo/yr
Natural Gas $18,683 8,839
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,638 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $37,608 $67,275 $25,613
640,358
kWh
$11,995
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,225 $11,500 $7,666
191,660
kWh
$5,559
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $12,035 $13,000 $4,916
122,896
kWh
$7,119
-
kW-mo/yr
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,994 $3,000 - $7,994
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,230 $25,000 $4,190
104,738
kWh
$3,040
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $2,639 $2,250 $2,639
65,985
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,209 $3,200 $1,853
46,331
kWh
$1,356
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,621 $1,120 $1,519
37,990
kWh
$1,102
-
kW-mo/yr
- -
09 2.7232: Replace existing hvac unit with high efficiency model $2,438 $23,800 $1,209
30,240
kWh
$949
-
kW-mo/yr
$280
-
MMBtu
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,860 $3,600 $912
22,801
kWh
$707
-
kW-mo/yr
- $241
11 2.7142: Utilize higher efficiency lamps and/or ballasts $1,567 $3,205 $912
22,805
kWh
$655
-
kW-mo/yr
- -
12 2.4221: Install compressor air intakes in coolest locations $1,182 $1,000 $617
15,427
kWh
$565
-
kW-mo/yr
- -
13 2.7145: Install skylights $1,030 $22,500 $1,030
25,766
kWh
- - -
TOTAL RECOMMENDED $94,638 $180,450 $53,076
1,326,997
kWh
$41,041
-
kW-mo/yr
$280
-
MMBtu
$241
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs