ITAC Assessment: OK0112
ITAC logo
ITAC Assessment: OK0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product FRESH WATER MARINAS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,154 240,035
kWh
Natural Gas $41,657 9,352
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,461 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $823 $1,750 - $823
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $860 $1,238 $860
14,947
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $420 $300 - $420
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $358 $262 - $358
-
MMBtu
TOTAL RECOMMENDED $2,461 $3,550 $860
14,947
kWh
$1,601
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs