Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MODULAR STEEL STRUCTURE
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area
n/a
Annual Production 305
pieces
Production Hrs. Annual 6,240
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,993 1,146,835
kWh
Natural Gas $12,959 2,027
MMBtu
Fuel Oil #2 $27,065 4,794
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,707 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,154

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $4,150 $1,265 $4,150
66,237
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $622 $320 $622
9,965
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $459 $600 $459
7,327
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,990 $100 $1,990
31,653
kWh
- -
05 2.4312: Improve lubrication practices $553 - $553
8,792
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $520 - $520
8,206
kWh
- -
07 2.4133: Use most efficient type of electric motors $226 $285 $226
3,517
kWh
- -
08 2.6214: Shut off pilots in standby equipment $187 - - $237
-
MMBtu
$(-50.0)
TOTAL RECOMMENDED $8,707 $2,570 $8,520
135,697
kWh
$237
-
MMBtu
$(-50.0)
TOTAL IMPLEMENTED $8,154 $2,570 $7,967
126,905
kWh
$237
-
MMBtu
$(-50.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs