Assessment Year | 1988 |
---|---|
Principal Product | MODULAR STEEL STRUCTURE |
NAICS |
n/a
|
SIC | 3448: Prefabricated Metal Buildings and Components |
Sales Range | $10 M to 50M |
# of Employees | 210 |
Plant Area |
n/a
|
Annual Production | 305
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,993 | 1,146,835 |
kWh
|
$0.063 |
Natural Gas | $12,959 | 2,027 |
MMBtu
|
$6.39 |
Fuel Oil #2 | $27,065 | 4,794 |
MMBtu
|
$5.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,707 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,154 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $4,150 | $1,265 |
$4,150
66,237
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $622 | $320 |
$622
9,965
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $459 | $600 |
$459
7,327
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,990 | $100 |
$1,990
31,653
kWh
|
- | - | |
05 | 2.4312: Improve lubrication practices | $553 | - |
$553
8,792
kWh
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $520 | - |
$520
8,206
kWh
|
- | - | |
07 | 2.4133: Use most efficient type of electric motors | $226 | $285 |
$226
3,517
kWh
|
- | - | |
08 | 2.6214: Shut off pilots in standby equipment | $187 | - | - |
$237
-
MMBtu
|
$(-50.0) | |
TOTAL RECOMMENDED | $8,707 | $2,570 |
$8,520
135,697
kWh
|
$237
-
MMBtu
|
$(-50.0) | ||
TOTAL IMPLEMENTED | $8,154 | $2,570 |
$7,967
126,905
kWh
|
$237
-
MMBtu
|
$(-50.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs