Assessment Year | 2011 |
---|---|
Principal Product | Fruit Prep |
NAICS | 311421: Fruit and Vegetable Canning |
SIC | 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
147,000
ft2
|
Annual Production | 40,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $348,731 | 5,434,372 |
kWh
|
$0.064 |
Electricity Demand | $167,294 | 11,281 |
kW-mo/yr
|
$14.83 |
Natural Gas | $465,882 | 47,618 |
MMBtu
|
$9.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $180,986 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $71,205 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $39,912 | $50,000 | - | - |
$39,912
-
MMBtu
|
- | |
02 | 2.2442: Preheat combustion air with waste heat | $14,396 | $30,000 | - | - |
$14,396
-
MMBtu
|
- | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $24,192 | $75,014 |
$9,032
141,120
kWh
|
$2,281
-
kW-mo/yr
|
$10,879
-
MMBtu
|
$2,000 | |
04 | 2.7261: Install timers and/or thermostats | $15,944 | $70 |
$8,481
132,520
kWh
|
- |
$7,463
-
MMBtu
|
- | |
05 | 2.7425: Clean or color roof to reduce solar load | $1,770 | $700 |
$1,770
27,666
kWh
|
- | - | - | |
06 | 2.7231: Use radiant heater for spot heating | $8,883 | $2,500 | - | - |
$8,883
-
MMBtu
|
- | |
07 | 2.7261: Install timers and/or thermostats | $8,857 | - | - | - |
$8,857
-
MMBtu
|
- | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,822 | $49,208 |
$754
11,784
kWh
|
$8,068
-
kW-mo/yr
|
- | - | |
09 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,246 | $3,000 | - |
$8,246
-
kW-mo/yr
|
- | - | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,609 | $9,000 |
$5,958
93,101
kWh
|
$2,651
-
kW-mo/yr
|
- | - | |
11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,507 | $1,760 |
$3,113
48,648
kWh
|
$1,394
-
kW-mo/yr
|
- | - | |
12 | 2.2136: Install / repair insulation on steam lines | $2,543 | $398 | - | - |
$2,543
-
MMBtu
|
- | |
13 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,614 | $1,000 |
$1,614
25,228
kWh
|
- | - | - | |
14 | 2.4221: Install compressor air intakes in coolest locations | $1,520 | $800 |
$1,016
15,868
kWh
|
$504
-
kW-mo/yr
|
- | - | |
15 | 2.2113: Repair or replace steam traps | $6,103 | $2,000 | - | - |
$6,103
-
MMBtu
|
- | |
16 | 2.7135: Install occupancy sensors | $11,102 | $4,725 |
$11,102
173,472
kWh
|
- | - | - | |
17 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,966 | $18,137 |
$9,665
151,008
kWh
|
$4,301
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $180,986 | $248,312 |
$52,505
820,415
kWh
|
$27,445
-
kW-mo/yr
|
$99,036
-
MMBtu
|
$2,000 | ||
TOTAL IMPLEMENTED | $71,205 | $128,552 |
$21,380
334,072
kWh
|
$11,743
-
kW-mo/yr
|
$36,082
-
MMBtu
|
$2,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs