ITAC Assessment: LE0312
ITAC logo
ITAC Assessment: LE0312
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Fruit Prep
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 147,000
ft2
Annual Production 40,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $348,731 5,434,372
kWh
Electricity Demand $167,294 11,281
kW-mo/yr
Natural Gas $465,882 47,618
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $180,986 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $71,205

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $39,912 $50,000 - - $39,912
-
MMBtu
-
02 2.2442: Preheat combustion air with waste heat $14,396 $30,000 - - $14,396
-
MMBtu
-
03 2.7232: Replace existing hvac unit with high efficiency model $24,192 $75,014 $9,032
141,120
kWh
$2,281
-
kW-mo/yr
$10,879
-
MMBtu
$2,000
04 2.7261: Install timers and/or thermostats $15,944 $70 $8,481
132,520
kWh
- $7,463
-
MMBtu
-
05 2.7425: Clean or color roof to reduce solar load $1,770 $700 $1,770
27,666
kWh
- - -
06 2.7231: Use radiant heater for spot heating $8,883 $2,500 - - $8,883
-
MMBtu
-
07 2.7261: Install timers and/or thermostats $8,857 - - - $8,857
-
MMBtu
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,822 $49,208 $754
11,784
kWh
$8,068
-
kW-mo/yr
- -
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,246 $3,000 - $8,246
-
kW-mo/yr
- -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,609 $9,000 $5,958
93,101
kWh
$2,651
-
kW-mo/yr
- -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,507 $1,760 $3,113
48,648
kWh
$1,394
-
kW-mo/yr
- -
12 2.2136: Install / repair insulation on steam lines $2,543 $398 - - $2,543
-
MMBtu
-
13 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,614 $1,000 $1,614
25,228
kWh
- - -
14 2.4221: Install compressor air intakes in coolest locations $1,520 $800 $1,016
15,868
kWh
$504
-
kW-mo/yr
- -
15 2.2113: Repair or replace steam traps $6,103 $2,000 - - $6,103
-
MMBtu
-
16 2.7135: Install occupancy sensors $11,102 $4,725 $11,102
173,472
kWh
- - -
17 2.7142: Utilize higher efficiency lamps and/or ballasts $13,966 $18,137 $9,665
151,008
kWh
$4,301
-
kW-mo/yr
- -
TOTAL RECOMMENDED $180,986 $248,312 $52,505
820,415
kWh
$27,445
-
kW-mo/yr
$99,036
-
MMBtu
$2,000
TOTAL IMPLEMENTED $71,205 $128,552 $21,380
334,072
kWh
$11,743
-
kW-mo/yr
$36,082
-
MMBtu
$2,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs