Assessment Year | 2010 |
---|---|
Principal Product | Magnesium powder |
NAICS | 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum) |
SIC | 3399: Primary Metal Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 47 |
Plant Area |
60,190
ft2
|
Annual Production | 3,500,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $215,134 | 2,557,500 |
kWh
|
$0.084 |
Electricity Demand | $68,082 | 10,924 |
kW-mo/yr
|
$6.23 |
Natural Gas | $79,634 | 5,763 |
MMBtu
|
$13.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,689 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $41,589 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $26,531 | $10,000 |
$23,990
285,606
kWh
|
$2,541
-
kW-mo/yr
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $5,363 | $200 |
$4,684
55,756
kWh
|
$679
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,484 | $1,420 |
$4,704
56,002
kWh
|
$480
-
kW-mo/yr
|
$(-700.0) | - | |
04 | 2.7232: Replace existing hvac unit with high efficiency model | $3,986 | $2,500 |
$3,556
42,336
kWh
|
$430
-
kW-mo/yr
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,225 | $20 |
$945
11,256
kWh
|
$280
-
kW-mo/yr
|
- | - | |
06 | 2.7135: Install occupancy sensors | $875 | $300 |
$875
10,145
kWh
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,896 | $4,636 |
$2,714
32,374
kWh
|
$277
-
kW-mo/yr
|
- | $905 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,402 | $7,308 |
$953
11,342
kWh
|
$362
-
kW-mo/yr
|
- | $87 | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,927 | $30,380 |
$2,165
25,771
kWh
|
$218
-
kW-mo/yr
|
- | $544 | |
TOTAL RECOMMENDED | $50,689 | $56,764 |
$44,586
530,588
kWh
|
$5,267
-
kW-mo/yr
|
$(-700.0) | $1,536 | ||
TOTAL IMPLEMENTED | $41,589 | $14,140 |
$37,879
450,956
kWh
|
$4,410
-
kW-mo/yr
|
$(-700.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs