Assessment Year | 2010 |
---|---|
Principal Product | Dietary Supplements |
NAICS | 311999: All Other Miscellaneous Food Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 254 |
Plant Area |
58,038
ft2
|
Annual Production | 18,200,000
lb
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $237,447 | 1,956,933 |
kWh
|
$0.12 |
Electricity Demand | $66,710 | 5,775 |
kW-mo/yr
|
$11.55 |
Natural Gas | $12,653 | 963 |
MMBtu
|
$13.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $275,848 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $83,659 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $161,306 | $1,080,000 |
$102,675
848,555
kWh
|
- | $28,800 | $29,831 | |
02 | 2.4321: Upgrade obsolete equipment | $30,883 | $29,000 |
$25,369
209,664
kWh
|
$4,434
-
kW-mo/yr
|
$1,080 | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,838 | $19,900 |
$15,771
130,341
kWh
|
$2,067
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,921 | $2,440 |
$10,072
83,237
kWh
|
$1,849
-
kW-mo/yr
|
- | - | |
05 | 2.4226: Use / purchase optimum sized compressor | $7,417 | $30,000 |
$7,417
61,300
kWh
|
- | - | - | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,315 | $3,000 | - |
$3,315
-
kW-mo/yr
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $2,827 | $1,000 |
$2,464
20,363
kWh
|
$363
-
kW-mo/yr
|
- | - | |
08 | 2.7135: Install occupancy sensors | $8,078 | $900 |
$8,078
66,761
kWh
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $32,263 | $42,718 |
$23,327
192,791
kWh
|
$8,936
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $275,848 | $1,208,958 |
$195,173
1,613,012
kWh
|
$20,964
-
kW-mo/yr
|
$29,880 | $29,831 | ||
TOTAL IMPLEMENTED | $83,659 | $99,958 |
$67,129
554,793
kWh
|
$16,530
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs