ITAC Assessment: LE0300
ITAC logo
ITAC Assessment: LE0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Dietary Supplements
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 254
Plant Area 58,038
ft2
Annual Production 18,200,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $237,447 1,956,933
kWh
Electricity Demand $66,710 5,775
kW-mo/yr
Natural Gas $12,653 963
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $275,848 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,659

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $161,306 $1,080,000 $102,675
848,555
kWh
- $28,800 $29,831
02 2.4321: Upgrade obsolete equipment $30,883 $29,000 $25,369
209,664
kWh
$4,434
-
kW-mo/yr
$1,080 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,838 $19,900 $15,771
130,341
kWh
$2,067
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,921 $2,440 $10,072
83,237
kWh
$1,849
-
kW-mo/yr
- -
05 2.4226: Use / purchase optimum sized compressor $7,417 $30,000 $7,417
61,300
kWh
- - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,315 $3,000 - $3,315
-
kW-mo/yr
- -
07 2.4221: Install compressor air intakes in coolest locations $2,827 $1,000 $2,464
20,363
kWh
$363
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $8,078 $900 $8,078
66,761
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $32,263 $42,718 $23,327
192,791
kWh
$8,936
-
kW-mo/yr
- -
TOTAL RECOMMENDED $275,848 $1,208,958 $195,173
1,613,012
kWh
$20,964
-
kW-mo/yr
$29,880 $29,831
TOTAL IMPLEMENTED $83,659 $99,958 $67,129
554,793
kWh
$16,530
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs