Assessment Year | 1996 |
---|---|
Principal Product | soft drinks |
NAICS |
n/a
|
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $10 M to 50M |
# of Employees | 52 |
Plant Area |
101,050
ft2
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $38,114 | 1,703,107 |
kWh
|
$0.022 |
Electricity Demand | $81,695 | 6,381 |
kW-mo/yr
|
$12.80 |
Electricity Fees | $(-3.0) | - |
|
- |
Natural Gas | $15,816 | 4,755 |
MMBtu
|
$3.33 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,283 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,563 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,233 | $5,520 |
$966
43,083
kWh
|
$1,267
-
kW-mo/yr
|
- | - | - | |
02 | 3.8132: Use less toxic and volatile solvent substitutes | $1,420 | $2,240 | - | - | - |
$2,060
-
gal
|
$(-640.0) | |
03 | 2.3191: Use demand controller or load shedder | $1,270 | $2,000 | - |
$1,270
-
kW-mo/yr
|
- | - | - | |
04 | 2.2437: Recover waste heat from equipment | $730 | $830 | - | - |
$730
-
MMBtu
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $570 | $470 |
$180
7,913
kWh
|
$390
-
kW-mo/yr
|
- | - | - | |
06 | 2.4133: Use most efficient type of electric motors | $60 | $37 |
$20
879
kWh
|
$40
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $6,283 | $11,097 |
$1,166
51,875
kWh
|
$2,967
-
kW-mo/yr
|
$730
-
MMBtu
|
$2,060
-
gal
|
$(-640.0) | ||
TOTAL IMPLEMENTED | $3,563 | $7,557 |
$986
43,962
kWh
|
$2,577
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs