Assessment Year | 2010 |
---|---|
Principal Product | Bottled water |
NAICS | 312112: Bottled Water Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
350,000
ft2
|
Annual Production | 63,500
Tgal
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $707,214 | 20,040,062 |
kWh
|
$0.035 |
Electricity Demand | $478,314 | 45,861 |
kW-mo/yr
|
$10.43 |
Natural Gas | $70,217 | 6,510 |
MMBtu
|
$10.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $132,940 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,555 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $77,015 | $56,771 |
$54,017
1,543,384
kWh
|
$22,998
-
kW-mo/yr
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $22,178 | $100,000 |
$19,831
566,625
kWh
|
$2,347
-
kW-mo/yr
|
- | - | |
03 | 2.2223: Enhance sensitivity of temperature control and cutoff | $8,306 | $20,000 |
$4,801
137,220
kWh
|
$3,505
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,050 | $2,440 |
$2,929
85,047
kWh
|
$5,121
-
kW-mo/yr
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $5,536 | $6,000 |
$3,648
104,216
kWh
|
$1,888
-
kW-mo/yr
|
- | - | |
06 | 2.7231: Use radiant heater for spot heating | $4,726 | $3,900 | - | - | - |
$4,726
-
MMBtu
|
|
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,787 | $4,200 |
$1,838
51,965
kWh
|
$949
-
kW-mo/yr
|
- | - | |
08 | 2.3134: Shift from daytime to nighttime operation | $2,423 | $1,750 | - | - | $2,423 | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,592 | $12,000 |
$904
25,833
kWh
|
$688
-
kW-mo/yr
|
- | - | |
10 | 2.7135: Install occupancy sensors | $327 | $630 |
$327
9,345
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $132,940 | $207,691 |
$88,295
2,523,635
kWh
|
$37,496
-
kW-mo/yr
|
$2,423 |
$4,726
-
MMBtu
|
||
TOTAL IMPLEMENTED | $30,555 | $103,070 |
$23,087
661,017
kWh
|
$7,468
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs