ITAC Assessment: LE0294
ITAC logo
ITAC Assessment: LE0294
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product house paint
NAICS 325510: Paint and Coating Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 320,190
ft2
Annual Production 24,000
Tgal
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $310,720 4,597,500
kWh
Electricity Demand $109,906 12,898
kW-mo/yr
Natural Gas $199,615 13,217
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $110,703 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,743

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $62,047 $3,000 $22,158
325,852
kWh
$2,199
-
kW-mo/yr
$37,690
-
MMBtu
02 2.4226: Use / purchase optimum sized compressor $16,939 $3,600 $13,588
199,826
kWh
$3,351
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,696 $12,000 $7,143
105,055
kWh
$7,553
-
kW-mo/yr
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,495 $3,000 - $5,495
-
kW-mo/yr
-
05 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $3,844 $6,000 - - $3,844
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,248 $1,824 $2,617
38,488
kWh
$631
-
kW-mo/yr
-
07 2.7233: Use properly designed and sized hvac equipment $2,376 $2,550 - - $2,376
-
MMBtu
08 2.4239: Eliminate or reduce compressed air usage $1,483 $800 $1,483
21,805
kWh
- -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $575 $40 $463
6,812
kWh
$112
-
kW-mo/yr
-
TOTAL RECOMMENDED $110,703 $32,814 $47,452
697,838
kWh
$19,341
-
kW-mo/yr
$43,910
-
MMBtu
TOTAL IMPLEMENTED $8,743 $4,824 $2,617
38,488
kWh
$6,126
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs