| Assessment Year | 2010 |
|---|---|
| Principal Product | house paint |
| NAICS | 325510: Paint and Coating Manufacturing |
| SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
320,190
ft2
|
| Annual Production | 24,000
Tgal
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $310,720 | 4,597,500 |
kWh
|
$0.068 |
| Electricity Demand | $109,906 | 12,898 |
kW-mo/yr
|
$8.52 |
| Natural Gas | $199,615 | 13,217 |
MMBtu
|
$15.10 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $110,703 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,743 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $62,047 | $3,000 |
$22,158
325,852
kWh
|
$2,199
-
kW-mo/yr
|
$37,690
-
MMBtu
|
|
| 02 | 2.4226: Use / purchase optimum sized compressor | $16,939 | $3,600 |
$13,588
199,826
kWh
|
$3,351
-
kW-mo/yr
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,696 | $12,000 |
$7,143
105,055
kWh
|
$7,553
-
kW-mo/yr
|
- | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,495 | $3,000 | - |
$5,495
-
kW-mo/yr
|
- | |
| 05 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $3,844 | $6,000 | - | - |
$3,844
-
MMBtu
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,248 | $1,824 |
$2,617
38,488
kWh
|
$631
-
kW-mo/yr
|
- | |
| 07 | 2.7233: Use properly designed and sized hvac equipment | $2,376 | $2,550 | - | - |
$2,376
-
MMBtu
|
|
| 08 | 2.4239: Eliminate or reduce compressed air usage | $1,483 | $800 |
$1,483
21,805
kWh
|
- | - | |
| 09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $575 | $40 |
$463
6,812
kWh
|
$112
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $110,703 | $32,814 |
$47,452
697,838
kWh
|
$19,341
-
kW-mo/yr
|
$43,910
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $8,743 | $4,824 |
$2,617
38,488
kWh
|
$6,126
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs