Assessment Year | 1999 |
---|---|
Principal Product | electronic components |
NAICS |
n/a
|
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
35,000
ft2
|
Annual Production | 0
pieces
|
Production Hrs. Annual | 4,400
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $67,333 | 1,305,393 |
kWh
|
$0.052 |
Electricity Demand | $66,845 | 4,136 |
kW-mo/yr
|
$16.16 |
Natural Gas | $83 | 10 |
MMBtu
|
$8.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $145,989 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,931 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7144: Install spectral reflectors / delamp | $6,221 | $5,880 |
$3,315
64,185
kWh
|
$2,906
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,699 | $10,196 |
$2,298
44,549
kWh
|
$2,401
-
kW-mo/yr
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $2,874 | $1,100 |
$1,186
22,860
kWh
|
$1,688
-
kW-mo/yr
|
- | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $38,175 | $12,000 |
$23,871
462,778
kWh
|
$29,127
-
kW-mo/yr
|
$(-14,823.0)
-
MMBtu
|
- | |
05 | 3.6192: Use a less expensive method of waste removal | $800 | - | - | - | - | $800 | |
06 | 3.6192: Use a less expensive method of waste removal | $2,832 | $1,000 | - | - | - | $2,832 | |
07 | 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water | $3,600 | $2,300 | - | - | - | $3,600 | |
08 | 4.321: Optimize production lot sizes and inventories | $86,788 | $60,000 | - | - | - | $86,788 | |
TOTAL RECOMMENDED | $145,989 | $92,476 |
$30,670
594,372
kWh
|
$36,122
-
kW-mo/yr
|
$(-14,823.0)
-
MMBtu
|
$94,020 | ||
TOTAL IMPLEMENTED | $11,931 | $13,496 |
$2,298
44,549
kWh
|
$2,401
-
kW-mo/yr
|
- | $7,232 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs