Assessment Year | 2009 |
---|---|
Principal Product | Aluminium Ornamental Fences |
NAICS | 332323: Ornamental and Architectural Metal Work Manufacturing |
SIC | 3446: Architectural and Ornamental Metal Work |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
440,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $211,872 | 2,932,896 |
kWh
|
$0.072 |
Electricity Demand | $137,053 | 10,193 |
kW-mo/yr
|
$13.45 |
Natural Gas | $350,400 | 31,326 |
MMBtu
|
$11.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $84,848 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,989 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $25,233 | $33,000 | - | - |
$25,233
-
MMBtu
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,606 | $1,000 |
$5,001
69,456
kWh
|
$5,605
-
kW-mo/yr
|
- | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,851 | $2,500 | - |
$6,851
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,293 | $8,000 |
$2,967
41,212
kWh
|
$3,326
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,989 | $2,500 |
$3,814
26,121
kWh
|
$175
-
kW-mo/yr
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $3,929 | $2,000 |
$1,852
25,733
kWh
|
$2,077
-
kW-mo/yr
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,326 | $168 |
$1,102
15,229
kWh
|
$1,224
-
kW-mo/yr
|
- | |
08 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $1,311 | $3,200 | - | - |
$1,311
-
MMBtu
|
|
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,531 | $76,000 |
$9,025
117,792
kWh
|
$9,506
-
kW-mo/yr
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,689 | $7,272 |
$882
11,700
kWh
|
$807
-
kW-mo/yr
|
- | |
11 | 2.7135: Install occupancy sensors | $4,090 | $1,890 |
$4,090
52,985
kWh
|
- | - | |
TOTAL RECOMMENDED | $84,848 | $137,530 |
$28,733
360,228
kWh
|
$29,571
-
kW-mo/yr
|
$26,544
-
MMBtu
|
||
TOTAL IMPLEMENTED | $34,989 | $90,272 |
$15,573
181,346
kWh
|
$19,416
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs