Assessment Year | 2009 |
---|---|
Principal Product | steel containers |
NAICS | 332431: Metal Can Manufacturing |
SIC | 3412: Metal Shipping Barrels, Drums, Kegs, and Pails |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
88,000
ft2
|
Annual Production | 12,500,000
pieces
|
Production Hrs. Annual | 4,576
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $759,982 | 6,402,132 |
kWh
|
$0.12 |
Electricity Demand | $158,198 | 14,709 |
kW-mo/yr
|
$10.76 |
Natural Gas | $583,487 | 58,844 |
MMBtu
|
$9.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $121,603 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $58,054 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $45,837 | $30,000 |
$37,058
311,414
kWh
|
$8,779
-
kW-mo/yr
|
- | |
02 | 3.2124: Convert to air assisted / airless paint guns | $20,433 | $20,000 |
$16,746
140,726
kWh
|
$3,687
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $19,083 | $1,760 |
$15,428
129,646
kWh
|
$3,655
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $9,314 | $800 |
$7,357
61,817
kWh
|
$1,957
-
kW-mo/yr
|
- | |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $7,908 | $3,000 | - |
$7,908
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,538 | $60,000 |
$14,115
118,610
kWh
|
$3,343
-
kW-mo/yr
|
$1,080 | |
07 | 2.7135: Install occupancy sensors | $490 | $450 | - |
$490
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $121,603 | $116,010 |
$90,704
762,213
kWh
|
$29,819
-
kW-mo/yr
|
$1,080 | ||
TOTAL IMPLEMENTED | $58,054 | $81,760 |
$46,289
388,982
kWh
|
$10,685
-
kW-mo/yr
|
$1,080 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs