ITAC Assessment: LE0280
ITAC logo
ITAC Assessment: LE0280
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Specialty machine components
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 238
Plant Area 107,000
ft2
Annual Production 587,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $299,292 6,899,317
kWh
Electricity Demand $140,079 14,549
kW-mo/yr
Natural Gas $42,748 5,223
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,292 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,502

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4226: Use / purchase optimum sized compressor $23,492 $40,000 $17,964
417,781
kWh
$5,528
-
kW-mo/yr
- -
02 2.6218: Turn off equipment when not in use $8,407 $3,000 $8,407
195,512
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,749 $980 $3,630
84,461
kWh
$1,119
-
kW-mo/yr
- -
04 4.652: Replace existing equipment with more suitable substitutes $3,154 $12,000 $1,411
32,824
kWh
$1,743
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,767 $1,000 $1,732
31,434
kWh
$35
-
kW-mo/yr
- -
06 2.1131: Repair faulty insulation in furnaces, boilers, etc $144 $560 - - $144
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $23,579 $65,839 $17,723
412,156
kWh
$6,040
-
kW-mo/yr
- $(-184.0)
TOTAL RECOMMENDED $65,292 $123,379 $50,867
1,174,168
kWh
$14,465
-
kW-mo/yr
$144
-
MMBtu
$(-184.0)
TOTAL IMPLEMENTED $38,502 $70,819 $31,492
723,563
kWh
$7,194
-
kW-mo/yr
- $(-184.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs