| Assessment Year | 2008 |
|---|---|
| Principal Product | Specialty machine components |
| NAICS | 332710: Machine Shops |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 238 |
| Plant Area |
107,000
ft2
|
| Annual Production | 587,000
pieces
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $299,292 | 6,899,317 |
kWh
|
$0.043 |
| Electricity Demand | $140,079 | 14,549 |
kW-mo/yr
|
$9.63 |
| Natural Gas | $42,748 | 5,223 |
MMBtu
|
$8.18 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $65,292 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $38,502 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4226: Use / purchase optimum sized compressor | $23,492 | $40,000 |
$17,964
417,781
kWh
|
$5,528
-
kW-mo/yr
|
- | - | |
| 02 | 2.6218: Turn off equipment when not in use | $8,407 | $3,000 |
$8,407
195,512
kWh
|
- | - | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,749 | $980 |
$3,630
84,461
kWh
|
$1,119
-
kW-mo/yr
|
- | - | |
| 04 | 4.652: Replace existing equipment with more suitable substitutes | $3,154 | $12,000 |
$1,411
32,824
kWh
|
$1,743
-
kW-mo/yr
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,767 | $1,000 |
$1,732
31,434
kWh
|
$35
-
kW-mo/yr
|
- | - | |
| 06 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $144 | $560 | - | - |
$144
-
MMBtu
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,579 | $65,839 |
$17,723
412,156
kWh
|
$6,040
-
kW-mo/yr
|
- | $(-184.0) | |
| TOTAL RECOMMENDED | $65,292 | $123,379 |
$50,867
1,174,168
kWh
|
$14,465
-
kW-mo/yr
|
$144
-
MMBtu
|
$(-184.0) | ||
| TOTAL IMPLEMENTED | $38,502 | $70,819 |
$31,492
723,563
kWh
|
$7,194
-
kW-mo/yr
|
- | $(-184.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs