Assessment Year | 2007 |
---|---|
Principal Product | Motor oils |
NAICS | 324191: Petroleum Lubricating Oil and Grease Manufacturing |
SIC | 2992: Lubricating Oils and Greases |
Sales Range | $100 M to 500M |
# of Employees | 22 |
Plant Area |
506,163
ft2
|
Annual Production | 30,000
Tgal
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $98,367 | 1,256,300 |
kWh
|
$0.078 |
Electricity Demand | $14,692 | 3,835 |
kW-mo/yr
|
$3.83 |
Electricity Fees | $7,977 | - |
|
- |
Natural Gas | $85,594 | 10,312 |
MMBtu
|
$8.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,970 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,286 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1133: Adjust burners for efficient operation | $9,761 | $500 | - | - | - |
$9,761
-
MMBtu
|
- | |
02 | 2.7224: Reduce space conditioning during non-working hours | $6,002 | $750 |
$5,604
71,573
kWh
|
- | $398 | - | - | |
03 | 4.611: Begin a practice of predictive / preventative maintenance | $2,372 | $240 |
$2,215
28,288
kWh
|
- | $157 | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,791 | $690 |
$1,672
21,355
kWh
|
- | $119 | - | - | |
05 | 2.7134: Use photocell controls | $1,014 | $90 |
$947
12,097
kWh
|
- | $67 | - | - | |
06 | 2.2511: Insulate bare equipment | $523 | $507 | - | - | - |
$523
-
MMBtu
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $386 | $200 |
$360
4,604
kWh
|
- | $26 | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $121 | $70 |
$52
666
kWh
|
$4
-
kW-mo/yr
|
$4 | - | $61 | |
TOTAL RECOMMENDED | $21,970 | $3,047 |
$10,850
138,583
kWh
|
$4
-
kW-mo/yr
|
$771 |
$10,284
-
MMBtu
|
$61 | ||
TOTAL IMPLEMENTED | $10,286 | $1,750 |
$9,543
121,882
kWh
|
$4
-
kW-mo/yr
|
$678 | - | $61 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs