| Assessment Year | 2016 |
|---|---|
| Principal Product | Water |
| NAICS | 221310: Water Supply and Irrigation Systems |
| SIC | 4941: Water Supply |
| Sales Range | $10 M to 50M |
| # of Employees | 130 |
| Plant Area |
75,000
ft2
|
| Annual Production | 2,200,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $224,376 | 5,415,642 |
kWh
|
$0.041 |
| Electricity Demand | $129,999 | 11,940 |
kW-mo/yr
|
$10.89 |
| Electricity Fees | $(-11,979.0) | - |
|
- |
| Natural Gas | $16,835 | 2,158 |
MMBtu
|
$7.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $63,618 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $47,422 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $2,225 | $500 | - |
$2,225
-
kW-mo/yr
|
- | |
| 02 | 2.8114: Change rate schedules or other changes in utility service | $15,323 | $500 | - |
$15,323
-
kW-mo/yr
|
- | |
| 03 | 2.8114: Change rate schedules or other changes in utility service | $21,630 | $500 |
$21,630
-
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,573 | $24,432 |
$2,234
53,822
kWh
|
$1,756
-
kW-mo/yr
|
$583 | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,671 | $4,410 |
$2,563
61,758
kWh
|
$910
-
kW-mo/yr
|
$198 | |
| 06 | 2.7135: Install occupancy sensors | $410 | $868 |
$410
9,886
kWh
|
- | - | |
| 07 | 2.7134: Use photocell controls | $45 | $160 |
$45
1,080
kWh
|
- | - | |
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,741 | $200,000 |
$11,472
277,108
kWh
|
$4,269
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $63,618 | $231,370 |
$38,354
403,654
kWh
|
$24,483
-
kW-mo/yr
|
$781 | ||
| TOTAL IMPLEMENTED | $47,422 | $30,342 |
$26,427
115,580
kWh
|
$20,214
-
kW-mo/yr
|
$781 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs