ITAC Assessment: UF0146
ITAC logo
ITAC Assessment: UF0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Isopropanol, Epsom Salts, Mineral Oil, Pharmaceutical Produc
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 40,000
ft2
Annual Production 2,600,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,038 3,327,374
kWh
Electricity Demand $52,152 6,600
kW-mo/yr
LPG $6,143 466
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,772 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,482

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,979 $8,198 $3,889
86,166
kWh
$1,090
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,032 $1,050 $13,032
214,244
kWh
- - -
03 2.7272: Install heat pipes / raise cooling setpoint $57,061 $80,000 - - - $57,061
04 2.7135: Install occupancy sensors $2,637 $640 $2,637
58,324
kWh
- - -
05 2.8212: Reduce delivery schedules $3,070 - - - $3,070 -
06 2.4133: Use most efficient type of electric motors $1,410 $3,332 $1,009
22,274
kWh
$401
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,583 $4,715 $1,583
35,170
kWh
- - -
TOTAL RECOMMENDED $83,772 $97,935 $22,150
416,178
kWh
$1,491
-
kW-mo/yr
$3,070 $57,061
TOTAL IMPLEMENTED $76,482 $92,580 $17,930
322,684
kWh
$1,491
-
kW-mo/yr
- $57,061
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs