ITAC Assessment: LE0275
ITAC logo
ITAC Assessment: LE0275
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Precision Machined Parts
NAICS 332721: Precision Turned Product Manufacturing
SIC 3451: Screw Machine Products
Sales Range $10
M
to 50
M
# of Employees 172
Plant Area 70,000
ft2
Annual Production 20,400,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $239,298 3,859,200
kWh
Electricity Demand $73,746 8,478
kW-mo/yr
Natural Gas $11,369 731
MMBtu
LPG $2,890 95
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $106,852 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,331

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,241 $20,000 $17,517
282,538
kWh
$4,724
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,646 $6,020 $16,646
268,488
kWh
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $12,225 $1,800 $9,406
151,710
kWh
$2,819
-
kW-mo/yr
- - -
04 2.7231: Use radiant heater for spot heating $9,912 $5,250 - - - $9,912
-
MMBtu
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $9,781 $2,200 $1,835
29,593
kWh
- $(-223.0) $8,169
-
MMBtu
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,675 $1,000 $5,257
84,787
kWh
$1,418
-
kW-mo/yr
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,495 $11,500 $4,329
69,825
kWh
$1,166
-
kW-mo/yr
- - -
08 2.7135: Install occupancy sensors $5,121 $300 $5,121
82,595
kWh
- - - -
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,949 $4,000 - $2,949
-
kW-mo/yr
- - -
10 2.4231: Reduce the pressure of compressed air to the minimum required $2,664 $50 $2,046
33,004
kWh
$618
-
kW-mo/yr
- - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $13,143 $47,522 $8,688
140,132
kWh
$2,349
-
kW-mo/yr
- - $2,106
TOTAL RECOMMENDED $106,852 $99,642 $70,845
1,142,672
kWh
$16,043
-
kW-mo/yr
$(-223.0) $18,081
-
MMBtu
$2,106
TOTAL IMPLEMENTED $43,331 $9,170 $38,476
620,584
kWh
$4,855
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs