Assessment Year | 2008 |
---|---|
Principal Product | Precision Machined Parts |
NAICS | 332721: Precision Turned Product Manufacturing |
SIC | 3451: Screw Machine Products |
Sales Range | $10 M to 50M |
# of Employees | 172 |
Plant Area |
70,000
ft2
|
Annual Production | 20,400,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $239,298 | 3,859,200 |
kWh
|
$0.062 |
Electricity Demand | $73,746 | 8,478 |
kW-mo/yr
|
$8.70 |
Natural Gas | $11,369 | 731 |
MMBtu
|
$15.55 |
LPG | $2,890 | 95 |
MMBtu
|
$30.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $106,852 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,331 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $22,241 | $20,000 |
$17,517
282,538
kWh
|
$4,724
-
kW-mo/yr
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,646 | $6,020 |
$16,646
268,488
kWh
|
- | - | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $12,225 | $1,800 |
$9,406
151,710
kWh
|
$2,819
-
kW-mo/yr
|
- | - | - | |
04 | 2.7231: Use radiant heater for spot heating | $9,912 | $5,250 | - | - | - |
$9,912
-
MMBtu
|
- | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $9,781 | $2,200 |
$1,835
29,593
kWh
|
- | $(-223.0) |
$8,169
-
MMBtu
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,675 | $1,000 |
$5,257
84,787
kWh
|
$1,418
-
kW-mo/yr
|
- | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,495 | $11,500 |
$4,329
69,825
kWh
|
$1,166
-
kW-mo/yr
|
- | - | - | |
08 | 2.7135: Install occupancy sensors | $5,121 | $300 |
$5,121
82,595
kWh
|
- | - | - | - | |
09 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,949 | $4,000 | - |
$2,949
-
kW-mo/yr
|
- | - | - | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,664 | $50 |
$2,046
33,004
kWh
|
$618
-
kW-mo/yr
|
- | - | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,143 | $47,522 |
$8,688
140,132
kWh
|
$2,349
-
kW-mo/yr
|
- | - | $2,106 | |
TOTAL RECOMMENDED | $106,852 | $99,642 |
$70,845
1,142,672
kWh
|
$16,043
-
kW-mo/yr
|
$(-223.0) |
$18,081
-
MMBtu
|
$2,106 | ||
TOTAL IMPLEMENTED | $43,331 | $9,170 |
$38,476
620,584
kWh
|
$4,855
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs