ITAC Assessment: LE0266
ITAC logo
ITAC Assessment: LE0266
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Custom point of purchase displays, kiosks, and retail environments
NAICS 337212: Custom Architectural Woodwork and Millwork Manufacturing
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 116,600
ft2
Annual Production 6,000
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,563 1,088,400
kWh
Electricity Demand $28,730 3,254
kW-mo/yr
Natural Gas $27,695 1,532
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,137

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7261: Install timers and/or thermostats $42,137 $2,614 $35,762
525,917
kWh
$6,375
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $28,436 $1,860 $28,436
418,170
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,346 $1,000 $1,898
27,915
kWh
$1,448
-
kW-mo/yr
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,847 $400 $999
14,696
kWh
$848
-
kW-mo/yr
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,436 $2,500 - $1,436
-
kW-mo/yr
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,255 $200 $663
9,750
kWh
$592
-
kW-mo/yr
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,535 $3,823 $1,511
22,216
kWh
$1,024
-
kW-mo/yr
08 2.7135: Install occupancy sensors $751 $300 $751
11,040
kWh
-
TOTAL RECOMMENDED $81,743 $12,697 $70,020
1,029,704
kWh
$11,723
-
kW-mo/yr
TOTAL IMPLEMENTED $42,137 $2,614 $35,762
525,917
kWh
$6,375
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs