Assessment Year | 2008 |
---|---|
Principal Product | Custom point of purchase displays, kiosks, and retail environments |
NAICS | 337212: Custom Architectural Woodwork and Millwork Manufacturing |
SIC | 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
116,600
ft2
|
Annual Production | 6,000
pieces
|
Production Hrs. Annual | 2,040
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $73,563 | 1,088,400 |
kWh
|
$0.068 |
Electricity Demand | $28,730 | 3,254 |
kW-mo/yr
|
$8.83 |
Natural Gas | $27,695 | 1,532 |
MMBtu
|
$18.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $81,743 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $42,137 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $42,137 | $2,614 |
$35,762
525,917
kWh
|
$6,375
-
kW-mo/yr
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $28,436 | $1,860 |
$28,436
418,170
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,346 | $1,000 |
$1,898
27,915
kWh
|
$1,448
-
kW-mo/yr
|
|
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,847 | $400 |
$999
14,696
kWh
|
$848
-
kW-mo/yr
|
|
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,436 | $2,500 | - |
$1,436
-
kW-mo/yr
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,255 | $200 |
$663
9,750
kWh
|
$592
-
kW-mo/yr
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,535 | $3,823 |
$1,511
22,216
kWh
|
$1,024
-
kW-mo/yr
|
|
08 | 2.7135: Install occupancy sensors | $751 | $300 |
$751
11,040
kWh
|
- | |
TOTAL RECOMMENDED | $81,743 | $12,697 |
$70,020
1,029,704
kWh
|
$11,723
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $42,137 | $2,614 |
$35,762
525,917
kWh
|
$6,375
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs