ITAC Assessment: IA0504
ITAC logo
ITAC Assessment: IA0504
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Wooden Cabinets for the Medical Industry
NAICS 337127: Institutional Furniture Manufacturing
SIC 2521: Wood Office Furniture
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 400,000
ft2
Annual Production 48,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,428 2,808,000
kWh
Electricity Demand $111,590 13,944
kW-mo/yr
Electricity Fees $26,684 -
Natural Gas $51,002 9,993
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,184 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,212 $105 $1,194
17,056
kWh
$1,018
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $12,322 $105 $7,426
106,080
kWh
$4,897
-
kW-mo/yr
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,346 $3,600 - - $1,346
-
MMBtu
04 2.7135: Install occupancy sensors $783 $3,064 $783
11,185
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $629 $1,795 $380
5,140
kWh
$249
-
kW-mo/yr
-
06 2.4133: Use most efficient type of electric motors $1,635 $13,667 $1,027
14,667
kWh
$608
-
kW-mo/yr
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $2,257 $27 - - $2,257
-
MMBtu
TOTAL RECOMMENDED $21,184 $22,363 $10,810
154,128
kWh
$6,772
-
kW-mo/yr
$3,603
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs