ITAC Assessment: LE0258
ITAC logo
ITAC Assessment: LE0258
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Manufactured Homes
NAICS 321991: Manufactured Home (Mobile Home) Manufacturing
SIC 2451: Mobile Homes
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 150,000
ft2
Annual Production 850
pieces
Production Hrs. Annual 2,160
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,141 942,000
kWh
Electricity Demand $38,161 4,285
kW-mo/yr
LPG $76,207 5,525
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,769 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $13,092 $6,400 - - $13,092
-
MMBtu
-
02 2.7231: Use radiant heater for spot heating $12,411 $18,750 - - $12,411
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,871 $10,000 $299
4,276
kWh
$4,572
-
kW-mo/yr
- $5,000
04 2.7313: Recycle air for heating, ventilation and air conditioning $6,874 $5,000 - - $6,874
-
MMBtu
-
05 2.3132: Recharge batteries on during off-peak demand periods $767 $150 - $767
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $15,367 $40,684 $9,231
131,878
kWh
$6,136
-
kW-mo/yr
- -
07 2.7135: Install occupancy sensors $387 $1,400 $387
5,526
kWh
- - -
TOTAL RECOMMENDED $58,769 $82,384 $9,917
141,680
kWh
$11,475
-
kW-mo/yr
$32,377
-
MMBtu
$5,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs