ITAC Assessment: LE0238
ITAC logo
ITAC Assessment: LE0238
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product collagen casings
NAICS 311613: Rendering and Meat Byproduct Processing
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 145,000
ft2
Annual Production 1,214,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,632,781 14,322,644
kWh
Electricity Demand $111,723 23,863
kW-mo/yr
Natural Gas $1,282,529 126,243
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,497,516 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $380,457

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $1,077,481 $2,403,050 $72,335
634,522
kWh
- - $1,005,146
02 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $902,617 $540,000 $957,600
8,400,000
kWh
$56,160
-
kW-mo/yr
$(-111,143.0)
-
MMBtu
-
03 2.8113: Purchase gas directly from a contract gas supplier $335,810 $500 - - $335,810
-
MMBtu
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $124,858 $17,600 $124,858
-
kWh
- - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $16,103 $2,500 - - $16,103
-
MMBtu
-
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $15,870 $3,000 - $15,870
-
kW-mo/yr
- -
07 2.4322: Use or replace with energy efficient substitutes $9,609 $45,000 $9,096
79,791
kWh
$513
-
kW-mo/yr
- -
08 2.4226: Use / purchase optimum sized compressor $5,409 $3,000 $5,109
44,822
kWh
$300
-
kW-mo/yr
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,223 $1,000 $4,933
43,279
kWh
$290
-
kW-mo/yr
- -
10 2.4221: Install compressor air intakes in coolest locations $1,471 $2,500 $1,340
11,750
kWh
$131
-
kW-mo/yr
- -
11 2.7111: Reduce illumination to minimum necessary levels $3,065 $90 $2,897
25,402
kWh
$168
-
kW-mo/yr
- -
TOTAL RECOMMENDED $2,497,516 $3,018,240 $1,178,168
9,239,566
kWh
$73,432
-
kW-mo/yr
$240,770
-
MMBtu
$1,005,146
TOTAL IMPLEMENTED $380,457 $51,090 $11,993
105,193
kWh
$16,551
-
kW-mo/yr
$351,913
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings