| Assessment Year | 2006 |
|---|---|
| Principal Product | collagen casings |
| NAICS | 311613: Rendering and Meat Byproduct Processing |
| SIC | 2013: Sausages and Other Prepared Meat Products |
| Sales Range | $10 M to 50M |
| # of Employees | 220 |
| Plant Area |
145,000
ft2
|
| Annual Production | 1,214,000
thousand feet
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,632,781 | 14,322,644 |
kWh
|
$0.11 |
| Electricity Demand | $111,723 | 23,863 |
kW-mo/yr
|
$4.68 |
| Natural Gas | $1,282,529 | 126,243 |
MMBtu
|
$10.16 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $2,497,516 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $380,457 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $1,077,481 | $2,403,050 |
$72,335
634,522
kWh
|
- | - | $1,005,146 | |
| 02 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $902,617 | $540,000 |
$957,600
8,400,000
kWh
|
$56,160
-
kW-mo/yr
|
$(-111,143.0)
-
MMBtu
|
- | |
| 03 | 2.8113: Purchase gas directly from a contract gas supplier | $335,810 | $500 | - | - |
$335,810
-
MMBtu
|
- | |
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $124,858 | $17,600 |
$124,858
-
kWh
|
- | - | - | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $16,103 | $2,500 | - | - |
$16,103
-
MMBtu
|
- | |
| 06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $15,870 | $3,000 | - |
$15,870
-
kW-mo/yr
|
- | - | |
| 07 | 2.4322: Use or replace with energy efficient substitutes | $9,609 | $45,000 |
$9,096
79,791
kWh
|
$513
-
kW-mo/yr
|
- | - | |
| 08 | 2.4226: Use / purchase optimum sized compressor | $5,409 | $3,000 |
$5,109
44,822
kWh
|
$300
-
kW-mo/yr
|
- | - | |
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,223 | $1,000 |
$4,933
43,279
kWh
|
$290
-
kW-mo/yr
|
- | - | |
| 10 | 2.4221: Install compressor air intakes in coolest locations | $1,471 | $2,500 |
$1,340
11,750
kWh
|
$131
-
kW-mo/yr
|
- | - | |
| 11 | 2.7111: Reduce illumination to minimum necessary levels | $3,065 | $90 |
$2,897
25,402
kWh
|
$168
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $2,497,516 | $3,018,240 |
$1,178,168
9,239,566
kWh
|
$73,432
-
kW-mo/yr
|
$240,770
-
MMBtu
|
$1,005,146 | ||
| TOTAL IMPLEMENTED | $380,457 | $51,090 |
$11,993
105,193
kWh
|
$16,551
-
kW-mo/yr
|
$351,913
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs