| Assessment Year | 2006 |
|---|---|
| Principal Product | Bulk Pharmaceutical Products |
| NAICS | 325412: Pharmaceutical Preparation Manufacturing |
| SIC | 2834: Pharmaceutical Preparations |
| Sales Range | $50 M to 100M |
| # of Employees | 130 |
| Plant Area |
67,500
ft2
|
| Annual Production | 500
ton
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,029,337 | 17,847,000 |
kWh
|
$0.058 |
| Electricity Demand | $176,627 | 27,512 |
kW-mo/yr
|
$6.42 |
| Natural Gas | $1,664,273 | 191,268 |
MMBtu
|
$8.70 |
| Fuel Oil #2 | $58,360 | 5,721 |
MMBtu
|
$10.20 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $320,067 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $72,993 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.5194: Redesign process | $149,763 | $12,500 | - | - |
$149,763
-
MMBtu
|
- | - | - | |
| 02 | 2.6218: Turn off equipment when not in use | $89,692 | $7,500 |
$72,524
1,250,417
kWh
|
$8,854
-
kW-mo/yr
|
- | - | $6,000 |
$2,314
-
Tgal
|
|
| 03 | 3.4111: Use closed cycle process to minimize waste water production | $64,774 | $2,000 | - | - | - |
$61,690
-
Tgal
|
- |
$3,084
-
Tgal
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,057 | $1,000 |
$4,391
75,712
kWh
|
$666
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 2.1133: Adjust burners for efficient operation | $3,961 | $200 | - | - |
$3,961
-
MMBtu
|
- | - | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $3,658 | $3,000 |
$2,920
50,339
kWh
|
$738
-
kW-mo/yr
|
- | - | - | - | |
| 07 | 2.7135: Install occupancy sensors | $3,162 | $900 |
$3,162
54,513
kWh
|
- | - | - | - | - | |
| TOTAL RECOMMENDED | $320,067 | $27,100 |
$82,997
1,430,981
kWh
|
$10,258
-
kW-mo/yr
|
$153,724
-
MMBtu
|
$61,690
-
Tgal
|
$6,000 |
$5,398
-
Tgal
|
||
| TOTAL IMPLEMENTED | $72,993 | $3,900 |
$7,553
130,225
kWh
|
$666
-
kW-mo/yr
|
- |
$61,690
-
Tgal
|
- |
$3,084
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs