ITAC Assessment: LE0230
ITAC logo
ITAC Assessment: LE0230
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product specialty gas mixtures
NAICS 325120: Industrial Gas Manufacturing
SIC 2813: Industrial Gases
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 50,000
ft2
Annual Production 60,000
pieces
Production Hrs. Annual 4,992
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,593 1,877,600
kWh
Electricity Demand $25,294 4,173
kW-mo/yr
Natural Gas $22,475 1,879
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,906 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $10,350 $2,400 - - $10,350
-
MMBtu
02 2.7233: Use properly designed and sized hvac equipment $9,950 $2,250 $9,950
107,016
kWh
- -
03 2.3134: Shift from daytime to nighttime operation $9,817 - - $9,817
-
kW-mo/yr
-
04 2.6218: Turn off equipment when not in use $6,528 - $6,528
70,200
kWh
- -
05 2.6218: Turn off equipment when not in use $1,758 $900 $1,758
18,900
kWh
- -
06 2.2511: Insulate bare equipment $959 $200 $959
10,361
kWh
- -
07 2.7135: Install occupancy sensors $2,282 $1,500 $2,282
24,534
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,262 $13,497 $3,257
35,027
kWh
$1,005
-
kW-mo/yr
-
TOTAL RECOMMENDED $45,906 $20,747 $24,734
266,038
kWh
$10,822
-
kW-mo/yr
$10,350
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs