ITAC Assessment: LE0223
ITAC logo
ITAC Assessment: LE0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Engraving and printing stationary supplies
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area 154,000
ft2
Annual Production 151,000,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,746 1,674,800
kWh
Electricity Demand $56,497 6,586
kW-mo/yr
Natural Gas $42,751 3,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $464,504 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,289

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $444,462 $1,100,000 $39,230
467,030
kWh
$15,276
-
kW-mo/yr
- $389,956
02 2.1224: Replace boiler $5,753 $74,500 - - $5,753
-
MMBtu
-
03 2.7221: Lower temperature during the winter season and vice-versa $4,650 $50 $3,339
39,746
kWh
$1,311
-
kW-mo/yr
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,831 $2,500 - $2,831
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,281 $100 $1,637
19,494
kWh
$644
-
kW-mo/yr
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,391 $250 $979
11,653
kWh
$412
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $844 $80 $483
5,746
kWh
$361
-
kW-mo/yr
- -
08 2.4221: Install compressor air intakes in coolest locations $457 $1,000 $261
3,109
kWh
$196
-
kW-mo/yr
- -
09 2.7135: Install occupancy sensors $375 $300 $375
4,465
kWh
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,460 - $1,048
12,840
kWh
$412
-
kW-mo/yr
- -
TOTAL RECOMMENDED $464,504 $1,178,780 $47,352
564,083
kWh
$21,443
-
kW-mo/yr
$5,753
-
MMBtu
$389,956
TOTAL IMPLEMENTED $14,289 $4,280 $8,122
97,053
kWh
$6,167
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs