ITAC Assessment: LE0219
ITAC logo
ITAC Assessment: LE0219
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Posters and news letters
NAICS 322230: Stationery Product Manufacturing
SIC 2731: Books: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 60,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,335 1,088,570
kWh
Natural Gas $14,341 1,799
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,325 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,393

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,717 $1,500 - $1,717
-
lb
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $912 $100 $912
6,517
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $352 $80 $352
2,514
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $129 $100 $129
921
kWh
-
05 2.7135: Install occupancy sensors $1,305 $675 $1,305
9,323
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,910 $14,173 $1,910
13,645
kWh
-
TOTAL RECOMMENDED $6,325 $16,628 $4,608
32,920
kWh
$1,717
-
lb
TOTAL IMPLEMENTED $1,393 $280 $1,393
9,952
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs