Assessment Year | 2005 |
---|---|
Principal Product | Cleaning Products |
NAICS | 325612: Polish and Other Sanitation Good Manufacturing |
SIC | 2842: Specialty Cleaning, Polishing, and Sanitation Preparations |
Sales Range | $50 M to 100M |
# of Employees | 49 |
Plant Area |
142,000
ft2
|
Annual Production | 73,000,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $139,678 | 2,226,320 |
kWh
|
$0.063 |
Electricity Demand | $37,303 | 5,092 |
kW-mo/yr
|
$7.33 |
Natural Gas | $146,822 | 15,952 |
MMBtu
|
$9.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $59,412 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7311: Ventilation system to shut off when room is not in use | $39,290 | $600 |
$2,031
32,227
kWh
|
- |
$37,259
-
MMBtu
|
|
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,740 | $3,000 | - |
$6,740
-
kW-mo/yr
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,249 | $1,250 | - | - |
$5,249
-
MMBtu
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,565 | $480 |
$3,565
57,502
kWh
|
- | - | |
05 | 2.2625: Chill water to the highest temperature possible | $3,530 | $480 |
$2,293
36,400
kWh
|
$1,237
-
kW-mo/yr
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,038 | $1,200 |
$867
13,759
kWh
|
$171
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $59,412 | $7,010 |
$8,756
139,888
kWh
|
$8,148
-
kW-mo/yr
|
$42,508
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs