| Assessment Year | 2005 |
|---|---|
| Principal Product | Aluminium Pigment |
| NAICS | 325130: Synthetic Dye and Pigment Manufacturing |
| SIC | 2816: Inorganic Pigments |
| Sales Range | $50 M to 100M |
| # of Employees | 84 |
| Plant Area |
110,000
ft2
|
| Annual Production | 4,300,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $371,898 | 8,578,800 |
kWh
|
$0.043 |
| Electricity Demand | $79,064 | 15,331 |
kW-mo/yr
|
$5.16 |
| Fuel Oil #2 | $246,604 | 30,246 |
MMBtu
|
$8.15 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $165,771 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $107,347 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Other Liquid (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $99,127 | $115,500 |
$83,064
1,931,741
kWh
|
$16,063
-
kW-mo/yr
|
- | - | |
| 02 | 2.4226: Use / purchase optimum sized compressor | $30,899 | $320 |
$22,169
515,559
kWh
|
$8,730
-
kW-mo/yr
|
- | - | |
| 03 | 3.6124: Burn waste oil for heat | $11,172 | $3,000 | - | - |
$9,770
-
MMBtu
|
$1,402
-
gal
|
|
| 04 | 2.4131: Size electric motors for peak operating efficiency | $8,220 | $1,588 |
$6,530
151,853
kWh
|
$1,690
-
kW-mo/yr
|
- | - | |
| 05 | 2.2437: Recover waste heat from equipment | $4,903 | $5,000 | - | - |
$4,903
-
MMBtu
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,894 | $480 |
$4,894
113,804
kWh
|
- | - | - | |
| 07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,801 | $2,000 | - |
$3,801
-
kW-mo/yr
|
- | - | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $2,755 | $600 |
$2,308
53,681
kWh
|
$447
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $165,771 | $128,488 |
$118,965
2,766,638
kWh
|
$30,731
-
kW-mo/yr
|
$14,673
-
MMBtu
|
$1,402
-
gal
|
||
| TOTAL IMPLEMENTED | $107,347 | $117,088 |
$89,594
2,083,594
kWh
|
$17,753
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Other Liquid (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs