ITAC Assessment: LE0211
ITAC logo
ITAC Assessment: LE0211
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Water Activated Gummed Sealing Tapes
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2641:
Sales Range $10
M
to 50
M
# of Employees 63
Plant Area 100,000
ft2
Annual Production 151,804
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,462 2,201,831
kWh
Electricity Demand $68,760 6,293
kW-mo/yr
Electricity Fees $683 -
Natural Gas $412,387 34,914
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $107,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,446

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.5111: Convert from indirect to direct fired systems $52,318 $23,385 - - $52,318
-
MMBtu
02 2.2511: Insulate bare equipment $23,185 $7,550 - - $23,185
-
MMBtu
03 2.7231: Use radiant heater for spot heating $19,652 $12,710 - - $19,652
-
MMBtu
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,558 $3,000 - $6,558
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,348 $2,355 $1,498
39,407
kWh
$850
-
kW-mo/yr
-
06 2.4226: Use / purchase optimum sized compressor $1,667 $1,070 $971
25,552
kWh
$696
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,128 $16,472 $778
20,470
kWh
$350
-
kW-mo/yr
-
08 2.4221: Install compressor air intakes in coolest locations $384 $300 $229
6,025
kWh
$155
-
kW-mo/yr
-
TOTAL RECOMMENDED $107,240 $66,842 $3,476
91,454
kWh
$8,609
-
kW-mo/yr
$95,155
-
MMBtu
TOTAL IMPLEMENTED $53,446 $39,857 $778
20,470
kWh
$350
-
kW-mo/yr
$52,318
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs